Rob Whelen, Wilimington, NC (Epula LLC)

Shane– drum is working great, developing a very nice patina, if you will.  7 roastings so far, fantastic flavor which to me is fuller than the fluid air bed roasts.  I am getting to 2nd crack at about 12 minutes.  I’d like to slow it down slightly but that’s a good time in my book.